Skip to main content

Erdman Anthony Chooses Hexagon’s Design and Analysis Solutions to Improve Project Collaboration and Reduce Costs

One of the main challenges on the project was a need to schedule system shutdowns during the demolition of some buildings, whilst also ensuring the continuous operation of the other systems.

Download PDF