Erdman Anthony Chooses Hexagon’s Design and Analysis Solutions to Improve Project Collaboration and Reduce Costs
One of the main challenges on the project was a need to schedule system shutdowns during the demolition of some buildings, whilst also ensuring the continuous operation of the other systems.